Better late than never, but never late is better: Risk assessment of nuclear power construction projects | |
Portugal-Pereira, J.1,2; Ferreira, P.3; Cunha, J.3; Szklo, A.1; Schaeffer, R.1; Araujo, M.3 | |
2018-09-01 | |
发表期刊 | ENERGY POLICY |
ISSN | 0301-4215 |
EISSN | 1873-6777 |
出版年 | 2018 |
卷号 | 120页码:158-166 |
文章类型 | Article |
语种 | 英语 |
国家 | Brazil; England; Portugal |
英文摘要 | This work seeks to evaluate overnight construction costs (OCC) and lead-time escalation of nuclear power construction projects from 1955 to 2016. To this end, a comprehensive database of commercial Light Water Reactors (LWR) was developed and a statistical analysis was conducted. Findings reveal a significant delay in lead-time, especially for the last generation reactors constructed from 2010s, with 3/4 of the sample showing significant construction delays. This results in an escalation of capital costs rather than in a decline. Average OCC of newer reactors is 60% higher than the ones implemented in the earlier stages of the nuclear era. This suggests a discontinuity of the learning curve for both OCC and lead-time, which threats the market and financial sustainability of current and future nuclear energy projects. Although this is a general trend, this discontinuity is country specific and, thus, induced by national policies and regulatory frameworks. Therefore, the role of nuclear technology as an alternative to cope with the need for a decarbonisation of the power sector must be better evaluated, taking into account the real cost impacts of nuclear technology implementation. |
英文关键词 | Nuclear energy Overnight construction costs Financial costs Risk assessment |
领域 | 气候变化 |
收录类别 | SCI-E ; SSCI |
WOS记录号 | WOS:000440123300015 |
WOS关键词 | RENEWABLE ENERGY SYSTEM ; POST-FUKUSHIMA ; COST OVERRUNS ; ELECTRICITY INFRASTRUCTURE ; PUBLIC ACCEPTANCE ; JAPAN ; REACTORS ; PLANTS ; CHINA ; MEGAPROJECTS |
WOS类目 | Economics ; Energy & Fuels ; Environmental Sciences ; Environmental Studies |
WOS研究方向 | Business & Economics ; Energy & Fuels ; Environmental Sciences & Ecology |
引用统计 | |
文献类型 | 期刊论文 |
条目标识符 | http://119.78.100.173/C666/handle/2XK7JSWQ/19180 |
专题 | 气候变化 |
作者单位 | 1.Univ Fed Rio de Janeiro, Ctr Tecnol, Energy Planning Program, Grad Sch Engn, Bloco C,Sala 211,Cidade Univ, BR-21941972 Rio De Janeiro, RJ, Brazil; 2.Imperial Coll London, Ctr Environm Policy, Weeks Bldg 16-18 Princes Gardens, London SW7 1BA, England; 3.Univ Minho, ALGORITMI Ctr, Sch Engn, Campus Azurem, P-4800058 Guimaraes, Portugal |
推荐引用方式 GB/T 7714 | Portugal-Pereira, J.,Ferreira, P.,Cunha, J.,et al. Better late than never, but never late is better: Risk assessment of nuclear power construction projects[J]. ENERGY POLICY,2018,120:158-166. |
APA | Portugal-Pereira, J.,Ferreira, P.,Cunha, J.,Szklo, A.,Schaeffer, R.,&Araujo, M..(2018).Better late than never, but never late is better: Risk assessment of nuclear power construction projects.ENERGY POLICY,120,158-166. |
MLA | Portugal-Pereira, J.,et al."Better late than never, but never late is better: Risk assessment of nuclear power construction projects".ENERGY POLICY 120(2018):158-166. |
条目包含的文件 | 条目无相关文件。 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论