GSTDTAP  > 资源环境科学
EPA Finalizes Cleanup Plan for Mansfield Trail Dump Superfund Site in Byram, New Jersey
admin
2019-10-02
发布年2019
语种英语
国家美国
领域资源环境
正文(英文)
Contact Information: 
Elias Rodriguez (rodriguez.elias@epa.gov)
212-637-3664

BYRAM, N.J. – The U.S. Environmental Protection Agency (EPA) has finalized a cleanup plan calling for several cleanup technologies to address contamination at the Mansfield Trail Dump Superfund site in Byram Township, New Jersey. Under the Record of Decision, EPA will cap former dump areas, treat contaminated groundwater, and dig up and remove contaminated soil among other steps to protect public health. 

"EPA is making progress to address the contamination that has plagued this community since the area was used as a dumping ground,” said EPA Regional Administrator Pete Lopez. “After listening to our neighbors, we are announcing our final plan, which will employ a combination of different cleanup methods to protect public health and the environment.”

EPA’s Record of Decision details the final plan to cap former dump areas to prevent rainwater from reaching the waste and further spreading the contamination. The final plan also calls for a soil vapor extraction system to reduce the volatile organic compounds contaminating the groundwater. This method removes harmful chemicals in the form of vapor from the soil by applying a vacuum. EPA will also apply non-hazardous additives to treat the groundwater and break down the contaminants as well as allowing the contaminants to naturally decline while monitoring them. The Record of Decision also calls for digging up and properly disposing of contaminated soil at an impacted residential area.

Throughout the cleanup, monitoring, testing and further studies will be conducted to ensure the effectiveness of the remedy. The final plan includes evaluations of nearby homes or buildings to test for chemical vapors that have the potential to migrate from groundwater beneath the structure to indoor air. The Record of Decision requires restrictions on future activities that could disturb the site and will limit future on-site construction in capped areas. EPA will conduct a review of the cleanup every 5 years to ensure its effectiveness. Under the final plan, the estimated cost of the cleanup is $11.5 million. 

EPA held a public meeting in July 2019 to explain its cleanup proposal, discuss the other cleanup options that were considered, and to solicit public comments. To read the EPA’s selected cleanup plan, outlined in the Record of Decision, and to view EPA’s responses to public comments in the Responsiveness Summary, please visit: www.epa.govhttps://www.epa.gov/superfund/mansfield-trail

For information about Superfund and the NPL:  https://www.epa.govhttps://www.epa.gov/superfund

Follow EPA Region 2 on Twitter at http://twitter.com/eparegion2 and visit our Facebook page, http://facebook.com/eparegion2.

19-082

URL查看原文
来源平台us environmental protection agency (epa)
文献类型新闻
条目标识符http://119.78.100.173/C666/handle/2XK7JSWQ/216894
专题资源环境科学
推荐引用方式
GB/T 7714
admin. EPA Finalizes Cleanup Plan for Mansfield Trail Dump Superfund Site in Byram, New Jersey. 2019.
条目包含的文件
条目无相关文件。
个性服务
推荐该条目
保存到收藏夹
查看访问统计
导出为Endnote文件
谷歌学术
谷歌学术中相似的文章
[admin]的文章
百度学术
百度学术中相似的文章
[admin]的文章
必应学术
必应学术中相似的文章
[admin]的文章
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。