Global S&T Development Trend Analysis Platform of Resources and Environment
DOI | 10.7249/RR455 |
报告编号 | RR-455-OSD |
Prolonged Cycle Times and Schedule Growth in Defense Acquisition: A Literature Review | |
Jessie Riposo; Megan McKernan; Chelsea Kaihoi | |
2014 | |
出版年 | 2014 |
页数 | 102 |
语种 | 英语 |
国家 | 美国 |
出版者 | RAND Corporation |
领域 | 资源环境 |
英文摘要 | This report summarizes a selection of the defense acquisition literature from the 1960s to the present on potential sources of prolonged acquisition cycle times and schedule growth, as well as potential opportunities for improvement. It presents the range of possible causes of schedule-related problems and various recommendations cited for improving schedules by various authors and organizations. This report does not provide critical analysis or an assessment of the strengths or weaknesses of the claims made in the literature. Rather, it provides a starting point for further research or consideration by government acquisition professionals, oversight organizations, and the analytic community. We identified the following reasons for schedule delays in the literature: (1) the difficulty of managing technical risk (e.g., program complexity, immature technology, and unanticipated technical issues), (2) initial assumptions or expectations that were difficult to fulfill (e.g., schedule estimates, risk control, requirements, and performance assumptions), and (3) funding instability. The most commonly cited recommendations for reducing cycle time and controlling schedule growth in the literature are strategies that manage or reduce technical risk. Some of those recommendations include using incremental fielding or evolutionary acquisition strategies, developing derivative products (rather than brand-new designs), using mature or proven technology (i.e., commercial, off-the-shelf components), maintaining stable funding, and using atypical contracting vehicles. |
英文关键词 | United States Department of Defense Military Acquisition and Procurement Military Technology Military Logistics |
URL | 查看原文 |
来源平台 | Rand Corporation |
引用统计 | |
文献类型 | 科技报告 |
条目标识符 | http://119.78.100.173/C666/handle/2XK7JSWQ/3931 |
专题 | 资源环境科学 |
推荐引用方式 GB/T 7714 | Jessie Riposo,Megan McKernan,Chelsea Kaihoi. Prolonged Cycle Times and Schedule Growth in Defense Acquisition: A Literature Review:RAND Corporation,2014. |
条目包含的文件 | 条目无相关文件。 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论