Global S&T Development Trend Analysis Platform of Resources and Environment
DOI | 10.7249/RR993 |
报告编号 | RR-993-A |
Developing a Repeatable Methodology to Calculate Retrograde Planning Factors | |
Kristan Klinghoffer; Kenneth J. Girardini; Arthur Lackey; Cheryl Kravchuck; Bonnie Magnuson | |
2015 | |
出版年 | 2015 |
页数 | 123 |
语种 | 英语 |
国家 | 美国 |
出版者 | RAND Corporation |
领域 | 资源环境 |
英文摘要 | Retrograde is the movement or return of both serviceable and unserviceable materiel back through the distribution system to a designated ship-to location, repair facility, or point of disposal. To plan for and field a force capable of efficient retrograde operations, the Army must possess accurate planning factors, by class of supply, to estimate the retrograde workload that will occur, both during ongoing theater operations and during redeployment operations. The flow of retrograde during operations over the past decade has been very slow. This has led to an almost continuous backlog in theater of materiel to be retrograded that the Army had difficulty eliminating. It appears that the Army regularly underresourced the theater organizations involved in retrograde operations, in part due to inadequate retrograde planning factors. To address this problem, RAND Arroyo Center developed and demonstrated a repeatable methodology for developing accurate retrograde planning factors, informed by process mapping, empirical data analysis, and discussions with Army supply officers. The methodology determines retrograde planning factors as a percentage of customer issues and is agnostic to theater, theater development, and unit type variances. The output of this report is a series of retrograde planning factors, by class of supply and by phase of operation, expressed as a percentage of forward flows of supplies to units. |
英文关键词 | Military Equipment Military Force Planning Military Logistics United States Army |
URL | 查看原文 |
来源平台 | Rand Corporation |
引用统计 | |
文献类型 | 科技报告 |
条目标识符 | http://119.78.100.173/C666/handle/2XK7JSWQ/4081 |
专题 | 资源环境科学 |
推荐引用方式 GB/T 7714 | Kristan Klinghoffer,Kenneth J. Girardini,Arthur Lackey,et al. Developing a Repeatable Methodology to Calculate Retrograde Planning Factors:RAND Corporation,2015. |
条目包含的文件 | 条目无相关文件。 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论