Global S&T Development Trend Analysis Platform of Resources and Environment
| DOI | 10.2172/1033088 |
| 报告编号 | PNNL-19349 |
| 来源ID | OSTI ID: 1033088 |
| Computational Fluid Dynamics Modeling of the John Day Dam Tailrace | |
| Rakowski, Cynthia L.; Perkins, William A.; Richmond, Marshall C.; Serkowski, John A. | |
| 2010-07-08 | |
| 出版年 | 2010 |
| 语种 | 英语 |
| 国家 | 美国 |
| 领域 | 地球科学 |
| 英文摘要 | US Army Corps of Engineers - Portland District required that a two-dimensional (2D) depth-averaged and a three-dimensional (3D) free-surface numerical models to be developed and validated for the John Day tailrace. These models were used to assess potential impact of a select group of structural and operational alternatives to tailrace flows aimed at improving fish survival at John Day Dam. The 2D model was used for the initial assessment of the alternatives in conjunction with a reduced-scale physical model of the John Day Project. A finer resolution 3D model was used to more accurately model the details of flow in the stilling basin and near-project tailrace hydraulics. Three-dimensional model results were used as input to the Pacific Northwest National Laboratory particle tracking software, and particle paths and times to pass a downstream cross section were used to assess the relative differences in travel times resulting from project operations and structural scenarios for multiple total river flows. Streamlines and neutrally-buoyant particles were seeded in all turbine and spill bays with flows. For a Total River of 250 kcfs running with the Fish Passage Plan spill pattern and a spillwall, the mean residence times for all particles were little changed; however the tails of the distribution were truncated for both spillway and powerhouse release points, and, for the powerhouse releases, reduced the residence time for 75% of the particles to pass a downstream cross section from 45.5 minutes to 41.3 minutes. For a total river of 125 kcfs configured with the operations from the Fish Passage Plan for the temporary spillway weirs and for a proposed spillwall, the neutrally-buoyant particle tracking data showed that the river with a spillwall in place had the overall mean residence time increase; however, the residence time for 75% of the powerhouse-released particles to pass a downstream cross section was reduced from 102.4 min to 89 minutes. |
| URL | 查看原文 |
| 来源平台 | US Department of Energy (DOE) |
| 引用统计 | |
| 文献类型 | 科技报告 |
| 条目标识符 | http://119.78.100.173/C666/handle/2XK7JSWQ/4816 |
| 专题 | 地球科学 |
| 推荐引用方式 GB/T 7714 | Rakowski, Cynthia L.,Perkins, William A.,Richmond, Marshall C.,et al. Computational Fluid Dynamics Modeling of the John Day Dam Tailrace,2010. |