Global S&T Development Trend Analysis Platform of Resources and Environment
DOI | 10.2172/1027700 |
报告编号 | PNNL-20734 |
来源ID | OSTI ID: 1027700 |
Preliminary Review of Safety Assessment Issues at Savannah River Site, August 2011 | |
Wolery, T W; Sutton, M | |
2011-09-19 | |
出版年 | 2011 |
语种 | 英语 |
国家 | 美国 |
领域 | 地球科学 |
英文摘要 | At the request of Savannah River Nuclear Solutions (SRNS) management, a review team composed of experts in atmospheric transport modeling for environmental radiation dose assessment convened at the Savannah River Site (SRS) on August 29-30, 2011. Several issues were presented at the meeting for discussion. This is a short summary that is organized in accordance with the primary issues discussed, which is not necessarily a chronological record. Issues include: SRS Meteorological Data and its Use in MACCS2; Deposition Velocities for Particles; Deposition Velocities for Tritium; MACCS2 Dispersion Coefficients; Use of Low Surface Roughness in Open Areas; Adequacy of Meteorological Tower and Instrumentation; Displacement Height; and Validity of MACCS2 Calculations at Close-in Distances. A longer report will be issued at a later date that expands upon these topics and recommendations. |
英文关键词 | Atmospheric dispersion modeling meteorological data safety assessment MACCS2 |
URL | 查看原文 |
来源平台 | US Department of Energy (DOE) |
引用统计 | |
文献类型 | 科技报告 |
条目标识符 | http://119.78.100.173/C666/handle/2XK7JSWQ/5426 |
专题 | 地球科学 |
推荐引用方式 GB/T 7714 | Wolery, T W,Sutton, M. Preliminary Review of Safety Assessment Issues at Savannah River Site, August 2011,2011. |
条目包含的文件 | 条目无相关文件。 |
个性服务 |
推荐该条目 |
保存到收藏夹 |
查看访问统计 |
导出为Endnote文件 |
谷歌学术 |
谷歌学术中相似的文章 |
[Wolery, T W]的文章 |
[Sutton, M]的文章 |
百度学术 |
百度学术中相似的文章 |
[Wolery, T W]的文章 |
[Sutton, M]的文章 |
必应学术 |
必应学术中相似的文章 |
[Wolery, T W]的文章 |
[Sutton, M]的文章 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论