Bioinjection Performance Review for the Building 100 Area and 4.5 Acre Site at the Pinellas County, Florida, Site
Survochak, Scott; Daniel, Joe
2016-05-01
出版年2016
页数31
语种英语
国家美国
领域地球科学
英文摘要This document provides a summary of a review of the performance of bioinjection activities at the Building 100 Area and the 4.5 Acre Site at the Pinellas County, Florida, Site since 2010, determines how best to optimize future injection events, and identifies the approach for the bioinjection event in 2016 at (1) the 4.5 Acre Site and (2) the Essentra property at the Building 100 Area. Because this document describes the next bioinjection event at the 4.5 Acre Site, it also serves as an addendum to the Interim Remedial Action Plan for Emulsified Edible Oil Injection at the 4.5 Acre Site (DOE 2013). In addition, this document revises the injection layout and injection intervals for the Essentra property that were originally described in the Interim Corrective Measure Work Plan for Source and Plume Treatment at the Building 100 Area (DOE 2014), and is a de facto update of that document. Bioinjection consists of injection of emulsified vegetable oil (EVO) and the microorganism Dehalococcoides mccartyi (DHM; formerly known as Dehalococcoides ethenogenes) into the subsurface to enhance biodegradation of trichloroethene (TCE), dichloroethene (DCE), and vinyl chloride (VC). VC is the only contaminant that exceeds its maximum contaminant level (10 micrograms per liter onsite and 1 microgram per liter onsite) on the 4.5 Acre Site and the Essentra property. Bioinjection was conducted at the 4.5 Acre Site in 2010 and 2013. Approximately 49,900 gallons of EVO and DHM were injected at 95 injection points in February 2010, and approximately 22,900 gallons of EVO and DHM were injected at 46 injection points in July 2013. The injection locations are shown on Figure 1. The goal of bioinjection at the 4.5 Acre Site is to decrease contaminant concentrations to maximum contaminant levels along the west and southwest property boundaries (to meet risk–based corrective action requirements) and to minimize the extent of the contaminant plume in the interior of the site. Bioinjection was conducted at the Building 100 Area in 3 phases from October 2014 through November 2015 (Figures 2–4). Approximately 32,850 gallons of EVO and DHM were injected using 62 temporary injection points in the onsite plumes in October and November 2014, 16,500 gallons were injected using 33 temporary injection points in the offsite plumes in February 2015, and 51,000 gallons were injected beneath the building using 8 horizontal wells in November 2015. The goal of bioinjection at the Building 100 Area is to enhance contaminant biodegradation to stabilize or shrink the contaminant plumes.
英文关键词bioinjection performance Pinellas FL
URL查看原文
来源平台US Department of Energy (DOE)
引用统计
文献类型科技报告
条目标识符http://119.78.100.173/C666/handle/2XK7JSWQ/7163
专题地球科学
推荐引用方式
GB/T 7714
Survochak, Scott,Daniel, Joe. Bioinjection Performance Review for the Building 100 Area and 4.5 Acre Site at the Pinellas County, Florida, Site,2016.
条目包含的文件
条目无相关文件。
个性服务
推荐该条目
保存到收藏夹
查看访问统计
导出为Endnote文件
谷歌学术
谷歌学术中相似的文章
[Survochak, Scott]的文章
[Daniel, Joe]的文章
百度学术
百度学术中相似的文章
[Survochak, Scott]的文章
[Daniel, Joe]的文章
必应学术
必应学术中相似的文章
[Survochak, Scott]的文章
[Daniel, Joe]的文章
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。