Independent Review of Elemental Phosphorus Remediation at the Eastern Michaud Flats FMC Operable Unit near Pocatello, Idaho
Martino, L. E.; Jerden, J. J.; Kimmell, T. A.; Quinn, J.
2016
出版年2016
页数378
语种英语
国家美国
领域地球科学
英文摘要If, despite risks to workers and these potential impacts, stakeholders decide that P4 wastes need to be excavated and treated, the Review Team determined that a number of the ETTs examined warrant further consideration for the treatment of P4 waste that has been characterized (for example, P4 waste present in the historical ponds). Nevertheless, concerns about the health and safety of site investigation workers using then-available investigation approaches prevented the collection of subsurface samples containing P4 from large areas of the site (e.g., the railroad swale, the vadose zone beneath the Furnace Building, and the abandoned railcars), As a result, the contaminant CSM in those particular areas was not refined enough to allow the Review Team to draw conclusions about using some of the ETTs to treat P4 waste in those areas. The readiness of an ETT for implementation varies depending on many factors, including stakeholder input, permitting, and remedial action construction requirements. Technologies that could be ready for use in the near term (within 1 year) include the following: mechanical excavation, containment technologies, off-site incineration, and drying and mechanical mixing under a tent structure. Technologies that could be ready for use in the mid-term (1 to 2 years) include cutter suction dredging, thermal-hydraulic dredging, and underground pipeline cleaning technologies. Technologies requiring a longer lead time (2 to 5 years) include on-site incineration, a land disposal restriction waste treatment system, an Albright & Wilson batch mud still, post-treatment on-site disposal, and post-treatment off-site disposal.
URL查看原文
来源平台US Department of Energy (DOE)
引用统计
文献类型科技报告
条目标识符http://119.78.100.173/C666/handle/2XK7JSWQ/7275
专题地球科学
推荐引用方式
GB/T 7714
Martino, L. E.,Jerden, J. J.,Kimmell, T. A.,et al. Independent Review of Elemental Phosphorus Remediation at the Eastern Michaud Flats FMC Operable Unit near Pocatello, Idaho,2016.
条目包含的文件
条目无相关文件。
个性服务
推荐该条目
保存到收藏夹
查看访问统计
导出为Endnote文件
谷歌学术
谷歌学术中相似的文章
[Martino, L. E.]的文章
[Jerden, J. J.]的文章
[Kimmell, T. A.]的文章
百度学术
百度学术中相似的文章
[Martino, L. E.]的文章
[Jerden, J. J.]的文章
[Kimmell, T. A.]的文章
必应学术
必应学术中相似的文章
[Martino, L. E.]的文章
[Jerden, J. J.]的文章
[Kimmell, T. A.]的文章
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。