已选(0)清除
条数/页: 排序方式: |
| DOE公布电网管理和风险评估系统研究资助计划 快报文章 地球科学快报,2020年第9期 作者: 王立伟
Microsoft Word(15Kb)  |   收藏  |  浏览/下载:398/0  |  提交时间:2020/05/09 power grid management risk assessment project funding |
| Global projections of drought hazard in a warming climate: a prime for disaster risk management 期刊论文 CLIMATE DYNAMICS, 2018, 50: 2137-2155 作者: Carrao, Hugo; Naumann, Gustavo; Barbosa, Paulo
 收藏  |  浏览/下载:17/0  |  提交时间:2019/04/09 Drought hazard Risk management Global warming CMIP5 models ISI-MIP project RCP scenarios |
| Project Management Guidelines and Handbook: Part I ? Project Management Guidelines, Part II ? Project Management Handbook 科技报告 来源:World Meteorological Organization (WMO). 出版年: 2016 作者: World Meteorological Organization
 收藏  |  浏览/下载:8/0  |  提交时间:2019/04/05 World Meteorological Organization (WMO) Guidelines Project management |
| Project Management Guidelines and Handbook 科技报告 来源:World Meteorological Organization (WMO). 出版年: 2016 作者: World Meteorological Organization
 收藏  |  浏览/下载:5/0  |  提交时间:2019/04/05 World Meteorological Organization (WMO) Guidelines Project management |
| West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2013 科技报告 来源:US Department of Energy (DOE). 出版年: 2014 作者: Rendall, John D.; Steiner, Alison F.; Pendl, Michael P.
 收藏  |  浏览/下载:26/0  |  提交时间:2019/04/05 West Valley Demonstration Project WVDP Annual Site Environmental Report ASER Calendar Year 2013 CH2M HILL ⢠B&W West Valley LLC DE-EM0001529 Public Health and Safety and the Environment Are Protected Airborne and Waterborne Releases to the MEOSI Climate Change DOE/NYSERDA Consent Decree Dose Assessment Dose to Biota Drinking Water Environmental Characterization Support Services Environmental Compliance Environmental Management System: EMS Environmental Monitoring Groundwater Protection Program High-Level Waste (HLW) Canister Interim Storage System HLW canister storage pad National Emissions Standards for Hazardous Air Pollutants NESHAP National Environmental Policy Act NEPA North Plateau Full-Scale Permeable Treatment Wall PTW Nuclear Regulatory Commission (NRC)-Licensed Disposal Area NDA Performance Indicators Phase 1 Decommissioning and Facility Disposition Contract Phase 1 Studies Quality Assurance Record of Decision ROD Resource Conservation and Recovery Act RCRA Safety Success Site Sustainability Plan SSP State Pollutant Discharge Elimination System (SPDES) Permit Noncompliance SPDES Tank and Vault Drying System T&VDS Vertical Storage Casks VSC Waste Minimization and Pollution Prevention Waste Tank Farm WTF Waste-Incidental-to-Reprocessing WIR |
| Screening Assessment of Potential Human-Health Risk from Future Natural-Gas Drilling Near Project Rulison in Western Colorado 科技报告 来源:US Department of Energy (DOE). 出版年: 2012 作者: Daniels Jeffrey I.,Chapman Jenny B.
 收藏  |  浏览/下载:14/0  |  提交时间:2019/04/05 The Project Rulison underground nuclear test was conducted in 1969 at a depth of 8 400 ft in the Williams Fork Formation of the Piceance Basin west-central Colorado (Figure 1). The U.S. Department of Energy Office of Legacy Management (LM) is the steward |
| Post evaluation of a capacity building project in the Southern synods of Ethiopia 科技报告 来源:Center for International Climate and Environmental Research-Oslo (CICERO). 出版年: 2010 作者: Kristensen, Kåre
 收藏  |  浏览/下载:3/0  |  提交时间:2019/04/05 East Africa Ethiopia Ethiopian Evangelical Church Mekane Yesus development aid project management VDP::Social science: 200::Sociology: 220 |