GSTDTAP

浏览/检索结果: 共5条,第1-5条 帮助

已选(0)清除 条数/页:   排序方式:
牛津能源研究所提出加强欧洲CCUS技术融入水泥行业 快报文章
气候变化快报,2023年第18期
作者:  刘莉娜
Microsoft Word(17Kb)  |  收藏  |  浏览/下载:384/1  |  提交时间:2023/09/19
EU  CCUS  Cement Sector  Pilot Project  
Does China's low-carbon pilot programme really take off? Evidence from land transfer of energy-intensive industry 期刊论文
ENERGY POLICY, 2018, 114: 482-491
作者:  Tang, Pengcheng;  Yang, Shuwang;  Shen, Jun;  Fu, Shuke
收藏  |  浏览/下载:6/0  |  提交时间:2019/04/09
Low-carbon pilot programme  Local secretary  Land transfer  Energy-intensive industry  Difference-in-differences  
Entropy-Bayesian Inversion of Time-Lapse Tomographic GPR data for Monitoring Dielectric Permittivity and Soil Moisture Variations 科技报告
来源:US Department of Energy (DOE). 出版年: 2013
作者:  Hou, Z;  Terry, N;  Hubbard, S S;  Csatho, B
收藏  |  浏览/下载:11/0  |  提交时间:2019/04/05
tomographic GPR  Bayesian inversion  soil moisture  pilot point  efficient sampling  minimum relative entropy  
CO2 Storage and Enhanced Oil Recovery: Bald Unit Test Site, Mumford Hills Oil Field, Posey County, Indiana 科技报告
来源:US Department of Energy (DOE). 出版年: 2012
作者:  Frailey, Scott M. [Illinois State Geological Survey, Champaign, IL (United States)];  Krapac, Ivan G. [Illinois State Geological Survey, Champaign, IL (United States)];  Damico, James R. [Illinois State Geological Survey, Champaign, IL (United States)];  Okwen, Roland T. [Illinois State Geological Survey, Champaign, IL (United States)];  McKaskle, Ray W. [Illinois State Geological Survey, Champaign, IL (United States)]
收藏  |  浏览/下载:11/0  |  提交时间:2019/04/05
CO2  EOR  storage  miscible  pilot  
Nevada National Security Site 2010 Data Report: Groundwater Monitoring Program Area 5 Radioactive Waste Management Site 科技报告
来源:US Department of Energy (DOE). 出版年: 2011
作者:  Zhang, Z. F. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)];  Strickland, Christopher E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)];  Field, Jim G. [Washington River Protection Solutions, Inc., Richland, W
收藏  |  浏览/下载:20/0  |  提交时间:2019/04/05
groundwater monitoring  Pit 3  Area 5 RWMS  mixed waste  Pilot Wells